Audio Topic
09:08:24 AM Start
09:09:04 AM SB119 || SB120
09:09:50 AM Fy15 Governor's Budget Overviews: Department of Labor and Workforce Development
09:16:39 AM Fy 15 Govervor's Budget Amendments
09:42:59 AM Fy15 Governor's Budget Overview: Department of Fish and Game
10:08:51 AM Fy15 Governor's Budget Overview: Department of Education and Early Development
10:42:11 AM Fy15 Governor's Budget Overview: Department of Revenue/ Alaska Housing Finance Corporation
11:24:09 AM Adjourn
* first hearing in first committee of referral
+ teleconferenced
= bill was previously heard/scheduled
+= SB 120 APPROP: OPERATING BUDGET/LOANS/FUNDS TELECONFERENCED
Heard & Held
FY 2015 Governor's Budget Amendments - Karen
Rehfeld
+= SB 119 BUDGET: CAPITAL TELECONFERENCED
Heard & Held
Dept. of Education and Early Development
Dept. of Fish and Game
Dept. of Revenue/AHFC
SENATE BILL NO. 119                                                                                                           
                                                                                                                                
     "An  Act   making  appropriations,   including  capital                                                                    
     appropriations   and   other   appropriations;   making                                                                    
     appropriations to capitalize funds."                                                                                       
                                                                                                                                
SENATE BILL NO. 120                                                                                                           
                                                                                                                                
     "An  Act making  appropriations for  the operating  and                                                                    
     loan  program  expenses  of state  government  and  for                                                                    
     certain  programs,   capitalizing  funds,   and  making                                                                    
     reappropriations; making appropriations  under art. IX,                                                                    
     sec. 17(c),  Constitution of the State  of Alaska, from                                                                    
     the constitutional budget reserve fund."                                                                                   
                                                                                                                                
Co-Chair Meyer discussed housekeeping.                                                                                          
                                                                                                                                
9:09:04 AM                                                                                                                    
                                                                                                                                
^FY15 GOVERNOR'S BUDGET OVERVIEWS: DEPARTMENT OF LABOR and                                                                    
WORKFORCE DEVELOPMENT                                                                                                         
                                                                                                                                
9:09:50 AM                                                                                                                    
GREY MITCHELL,  ASSISTANT COMMISSIONER, DEPARTMENT  OF LABOR                                                                    
AND WORKFORCE  DEVELOPMENT, provided a  general introduction                                                                    
to the department's capital budget  requests for FY15, which                                                                    
totaled $9,170,000.                                                                                                             
                                                                                                                                
9:11:09 AM                                                                                                                    
                                                                                                                                
PALOMA    HARBOUR,   DIRECTOR,    ADMINISTRATIVE   SERVICES,                                                                    
DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT, spoke to the                                                                     
details of the capital requests:                                                                                                
                                                                                                                                
     RN 48826                                                                                                                 
     Heavy Equipment Shop/Diesel Shop/Pipe Welding                                                                            
     $8,000,000                                                                                                               
                                                                                                                                
     Brief Summary and Statement of Need:                                                                                   
     The second  phase for  the Alaska  Vocational Technical                                                                    
     Center's (AVTEC) Heavy  Equipment Shop/Diesel Shop/Pipe                                                                    
     Welding   Relocation   project  will   continued   work                                                                    
     necessary to  replace an  existing facility  with known                                                                    
     life, safety,  code and ADA deficiencies.  Phase two of                                                                    
     this  project will  include  construction  of a  13,000                                                                    
     square  foot steel  fabricated building  and relocation                                                                    
     of   the  Heavy   Equipment   and  Medium/Heavy   Truck                                                                    
     Technology  programs   from  the   currently  deficient                                                                    
     space.                                                                                                                     
                                                                                                                                
     Project Description/Justification:                                                                                     
     The   Alaska   Vocational  Technical   Center   (AVTEC)                                                                    
     supports the department's  mission by training Alaskans                                                                    
     for    employment   in    Alaska.   The    Diesel/Heavy                                                                    
     Equipment/Truck Technologies program  at AVTEC produces                                                                    
     36  trained Alaskans  per year  that are  highly sought                                                                    
     after  by   the  mining,  construction,   oil/gas,  and                                                                    
     transportation  industries   for  employment.   With  a                                                                    
     nearly 100 percent job placement  rate, this program is                                                                    
     a  stellar  performer  preparing Alaska  residents  for                                                                    
     good  wage  jobs   with  opportunity  for  advancement.                                                                    
     AVTEC's    Combination     Welding    program    trains                                                                    
     approximately  28  Alaskans  per  year  in  the  highly                                                                    
     sought after areas of structural  and pipe welding. Co-                                                                    
     locating the  two parts  of this  program will  lead to                                                                    
     efficiencies  and  expand  the  capacity  of  the  pipe                                                                    
     portion of the program.                                                                                                    
                                                                                                                                
     The  existing   Pipe  Welding,  Heavy   Equipment,  and                                                                    
     Medium/Heavy Truck Technology  program shops are housed                                                                    
     in   a   pre-engineered   metal   building   that   was                                                                    
     constructed in  the early 1970s.  In October  2012, the                                                                    
     department  contracted  with  an  engineering  firm  to                                                                    
     complete  a structural  review  of  this facility.  The                                                                    
     review  confirmed previous  findings that  the facility                                                                    
     lacked  sufficient lateral  support for  any repair  or                                                                    
     replacement of  the roof to occur.  The engineers cited                                                                    
     the building as hazardous and dangerous.                                                                                   
                                                                                                                                
     Phase one of this project  was funded in FY2014 (Sec 1,                                                                    
     Ch  16,  SLA  13,  Pg  68, Ln  26)  and  included  site                                                                    
     preparation,  utilities, and  construction of  an 8,000                                                                    
     square  foot Diesel  shop; and  relocation of  the Pipe                                                                    
     Welding program from the  current deficient facility to                                                                    
     the vacated Diesel space.                                                                                                  
                                                                                                                                
     Phase   two   of   this  project   will   include:   1)                                                                    
     construction of an 13,000  square foot steel fabricated                                                                    
     facility to house the  Heavy Equipment and Medium/Heavy                                                                    
     Truck  Technologies programs;  and 3)relocation  of the                                                                    
     Heavy  Equipment  and Medium/Heavy  Truck  Technologies                                                                    
     programs  to  the new  facility  from  a building  with                                                                    
     known   life,   safety,   code   and   Americans   with                                                                    
     Disabilities Act (ADA)deficiencies.                                                                                        
                                                                                                                                
9:12:23 AM                                                                                                                    
                                                                                                                                
Senator Hoffman  inquired where the operation  dollars would                                                                    
come  from.  Ms. Harbour  responded  that  the new  facility                                                                    
would have less  heat loss and would therefore  cost less in                                                                    
operating dollars than the old facility.                                                                                        
                                                                                                                                
9:12:50 AM                                                                                                                    
                                                                                                                                
Senator  Dunleavy inquired  where  the  AVTECH funding  came                                                                    
from. Ms.  Harbour responded that AVTECH  was supported with                                                                    
general funds,  fees generated  from students,  funding from                                                                    
interagency  agreements  and  statutory  designated  program                                                                    
receipt revenue.                                                                                                                
                                                                                                                                
Senator  Dunleavy understood  that the  program was  open to                                                                    
all  Alaskans. Ms.  Harbour  replied  yes. Senator  Dunleavy                                                                    
asked whether  all programs related  to labor  training were                                                                    
open to all Alaskans. Ms. Harbour said yes.                                                                                     
                                                                                                                                
9:13:46 AM                                                                                                                    
                                                                                                                                
Ms. Harbour continued:                                                                                                          
                                                                                                                                
     RN 58337                                                                                                                 
     Employment and Training Services Public Access Network                                                                   
     $170,000                                                                                                                 
                                                                                                                                
     Brief Summary and Statement of Need:                                                                                   
     This project  will develop  infrastructure to  a public                                                                    
     access network  infrastructure which  includes hardware                                                                    
     and software  acquisition and installation.  The public                                                                    
     network  will address  security audit  findings related                                                                    
     to allowing  anonymous access  on job  center computers                                                                    
     to  the state's  wide  area network.  These job  center                                                                    
     computers are  critical to the department's  mission to                                                                    
     connect Alaskans to gainful employment.                                                                                    
                                                                                                                                
     Project Description/Justification:                                                                                     
     Recent state  legislative security audits  have pointed                                                                    
     to public  access computers on  the state network  as a                                                                    
     potential security threat.                                                                                                 
                                                                                                                                
     Providing  internet  resources   in  the  Job  Services                                                                    
     Offices allows  clients to access the  various services                                                                    
     available  with the  support and  guidance  of the  job                                                                    
     center staff. Without internet  access to resources for                                                                    
     clients, Job Services would be less effective.                                                                             
                                                                                                                                
     RN 48821                                                                                                                 
    Deferred Maintenance, Renewal, Repair and Equipment                                                                       
     $1,000,000                                                                                                               
                                                                                                                                
     Brief Summary and Statement of Need:                                                                                   
     This project will  provide deferred maintenance funding                                                                    
     for  the Alaska  Vocational Technical  Center's (AVTEC)                                                                    
     16 buildings  in Seward.  Specific projects  related to                                                                    
     this  request  include  student apartment  repairs  and                                                                    
     remodels;   replacement   of   lighting,   doors,   and                                                                    
     baseboard  heaters and  zone valves  to improve  energy                                                                    
     efficiency  at the  applied technologies  facility, and                                                                    
     replacement  of ceiling  tiles  and  carpet within  the                                                                    
     First Lake Campus' three facilities.                                                                                       
                                                                                                                                
^FY 15 GOVERVOR'S BUDGET AMENDMENTS                                                                                           
                                                                                                                                
9:16:39 AM                                                                                                                    
                                                                                                                                
KAREN REHFELD,  DIRECTOR, OFFICE  OF MANAGEMENT  AND BUDGET,                                                                    
OFFICE OF THE GOVERNOR,  directed committee attention to the                                                                    
amendment spreadsheets  for the supplemental,  operating and                                                                    
capital  budgets  (copy on  file).  She  spoke to  the  FY14                                                                    
supplemental   spreadsheet,  which   listed  the   following                                                                    
proposed amendments totaling $32,700.0:                                                                                         
                                                                                                                                
     Department   of   Commerce,  Community   and   Economic                                                                  
     Development                                                                                                              
     Capital                                                                                                                  
     General Fund                                                                                                             
     $32,700.0                                                                                                                
                                                                                                                                
     Susitna-Watana Hydroelectric Project                                                                                       
     This project supports  the Susitna-Watana Hydroelectric                                                                    
     project and  provides for  continued progress  of field                                                                    
     studies needed  to file a  Susitna-Watana Hydroelectric                                                                    
     Project  Federal  Energy Regulatory  Commission  (FERC)                                                                    
     license   application.  The   sum  of   $32,700,000  is                                                                    
     appropriated  from  the  general  fund  to  the  Alaska                                                                    
     Energy   Authority   (AEA)   for   the   Susitna-Watana                                                                    
     Hydroelectric  Project  contingent upon  AEA  obtaining                                                                    
     and holding  valid executed land access  permits needed                                                                    
     to conduct field studies and other activities.                                                                             
                                                                                                                                
Ms. Rehfeld addressed line 3 of the spreadsheet:                                                                                
                                                                                                                                
     Fuel Branch-wide Unallocated                                                                                             
     Appropriation                                                                                                            
     General Fund                                                                                                             
     $0.0                                                                                                                     
                                                                                                                                
     Reappn: sec. 22e(1), ch. 14, SLA 2013                                                                                      
     Reappropriation for  costs and lost  revenue associated                                                                    
     with the Tustumena cancelled service and repairs.                                                                          
     The  unexpended and  unobligated balance,  estimated to                                                                    
     be                                                                                                                         
     $2,500,000,  of the  appropriation made  in sec.  22(a)                                                                    
     and (b)  and allocated  in sec.  22(e)(1), ch.  14, SLA                                                                    
     2013,   page    75,   lines   27-28    (Department   of                                                                    
     Transportation and  Public Facilities fuel  and utility                                                                    
     costs) is  reappropriated to the Alaska  marine highway                                                                    
     system fund  (AS 19.65.060(a)) to cover  costs and lost                                                                    
     revenue   associated  with   the  Tustumena   cancelled                                                                    
     service and repairs.                                                                                                       
                                                                                                                                
Ms. Rehfeld pointed to line 4 of the spreadsheet:                                                                               
     Fuel Branch-wide Unallocated                                                                                             
     Appropriation                                                                                                            
     General Fund                                                                                                             
     $0.0                                                                                                                     
                                                                                                                                
     Reappn: sec. 22e(1), ch. 14, SLA 2013                                                                                      
     Reappropriation to Alaska  marine highway system vessel                                                                    
     replacement fund (AS 37.05.550).                                                                                           
     The   unexpended   and   unobligated   balance,   after                                                                    
     application of  the amount appropriated in  (b) of this                                                                    
     section,   estimated   to   be   $5,000,000,   of   the                                                                    
     appropriation made in sec. 22(a)  and (b) and allocated                                                                    
     in sec. 22(e)(1), ch. 14,  SLA 2013, page 75, lines 27-                                                                    
     28 (Department of  Transportation and Public Facilities                                                                    
     fuel  and  utility  costs)  is  reappropriated  to  the                                                                    
     Alaska  marine highway  system vessel  replacement fund                                                                    
     (AS 37.05.550).                                                                                                            
                                                                                                                                
Ms. Rehfeld  spoke to the  1 page Governors  Amended Summary                                                                    
(copy  on file),  which listed  the different  components of                                                                    
the  operating  budget;  Operating  Agencies  -  Non-Formula                                                                    
requests  $9,770.3,  Formula   programs  reflected  a  small                                                                    
decrement of $150.0, Debt Services  reflected a reduction of                                                                    
$10,512.3 and  a reduction in  Fund Transfers  of $10,000.0.                                                                    
She  noted  that there  was  one  capital amendment  up  for                                                                    
consideration.  She  turned   to  the  Operating  Amendments                                                                    
spreadsheet  (copy  on  file).  She  noted  that  the  three                                                                    
requests on Page 1 were related to the affordable care act:                                                                     
                                                                                                                                
     Department of Administration                                                                                             
     Finance                                                                                                                  
     General Fund                                                                                                             
     FY2015 December Budget: $10,836.9                                                                                        
     FY2015 Total Amendments: $61.3                                                                                           
     FY2015 Total: $10,898.2                                                                                                  
                                                                                                                              
     Patient-Centered Outcomes Research Institute                                                                             
     Mandated by Patient Protection and Affordable                                                                            
     Care Act                                                                                                                 
     The Patient Protection and  Affordable Care Act imposes                                                                    
     a fee for self-insured active  health plans to fund the                                                                    
     Patient-Centered  Outcomes  Research Institute  (PCORI)                                                                    
     trust fund.  This is a  new request for FY2015.  It was                                                                    
     not included  in the  FY2015 Governor's  budget because                                                                    
     it  was unclear  if  the state  would  continue to  pay                                                                    
     mandatory  and unanticipated  fees and  taxes that  are                                                                    
     related  to the  Affordable Care  Act and  imposed upon                                                                    
     the  state  from  the  federal  government.  There  was                                                                    
     discussion  regarding potential  litigation and  it was                                                                    
     determined that these fees and  taxes should be paid to                                                                    
     avoid  penalties   even  if  the  state   entered  into                                                                    
     litigation.                                                                                                                
                                                                                                                                
     Department of Administration                                                                                             
     Retirement and Benefits                                                                                                  
     General Fund                                                                                                             
     FY2015 December Budget: $16,984.7                                                                                        
     FY2015 Total Amendments: $3,268.0                                                                                        
     FY2015 Total: $20,252.7                                                                                                  
                                                                                                                              
     Patient-Centered Outcomes Research Institute                                                                             
     Mandated by Patient Protection and Affordable                                                                            
     Care Act                                                                                                                 
     The Patient Protection and  Affordable Care Act imposes                                                                    
     a  fee for  self-insured retiree  health plans  to fund                                                                    
     the   Patient-Centered   Outcomes  Research   Institute                                                                    
     (PCORI) trust fund.  This is a new  request for FY2015.                                                                    
     It  was not  included in  the FY2015  Governor's budget                                                                    
     because it was  unclear if the state  would continue to                                                                    
     pay  mandatory and  unanticipated fees  and taxes  that                                                                    
     are  related to  the  Affordable Care  Act and  imposed                                                                    
     upon the  state from the federal  government. There was                                                                    
     discussion  regarding potential  litigation and  it was                                                                    
     determined that these fees and  taxes should be paid to                                                                    
     avoid  penalties   even  if  the  state   entered  into                                                                    
     litigation.                                                                                                                
                                                                                                                                
     Department of Administration                                                                                             
     Retirement and Benefits                                                                                                  
     1017 Benefits Systems Receipts                                                                                           
     1,121.4                                                                                                                  
     1029 Public Employees Retirement System Fund                                                                             
     1,485.0                                                                                                                  
     1034 Teachers Retirement System Fund                                                                                     
     588.0                                                                                                                    
     1042 Judicial Retirement System                                                                                          
     5.6                                                                                                                      
                                                                                                                              
     FY2015 December Budget: $16,984.7                                                                                        
     FY2015 Total Amendments: $3,268.0                                                                                        
     FY2015 Total: $20,252.7                                                                                                  
                                                                                                                              
     Reinsurance  Fee  Mandated  by Patient  Protection  and                                                                  
     Affordable Care Act                                                                                                      
     The Patient Protection and  Affordable Care Act imposes                                                                    
     a   mandatory,   temporary,   three-year   transitional                                                                    
     reinsurance program  to help stabilize premiums  in the                                                                    
     individual health  insurance market from 2014  to 2016.                                                                    
     This is a  new request for FY2015. It  was not included                                                                    
     in the FY2015 Governor's  budget because it was unclear                                                                    
     if  the  state  would  continue to  pay  mandatory  and                                                                    
     unanticipated fees  and taxes  that are related  to the                                                                    
     Affordable  Care Act  and imposed  upon the  state from                                                                    
     the federal government.  There was discussion regarding                                                                    
     potential litigation  and it was determined  that these                                                                    
     fees and taxes  should be paid to  avoid penalties even                                                                    
     if the state entered into litigation.                                                                                      
                                                                                                                                
Ms. Rehfeld turned to Page 2:                                                                                                   
                                                                                                                                
     Department of Administration                                                                                             
    Elected Public Officers Retirement System Benefits                                                                        
     General Fund                                                                                                             
     FY2015 December Budget: $2,248.1                                                                                         
     FY2015 Total Amendments: -$150.0                                                                                         
     FY2015 Total: $2,098.1                                                                                                   
                                                                                                                              
     Elected Public Officers Retirement System Cost                                                                           
     Savings                                                                                                                  
    This amendment reduces authority needed for Elected                                                                         
     Public Officers Retirement System  due to the reduction                                                                    
     of members.  This is a  new request for FY2015.  It was                                                                    
     not included  in the  FY2015 Governor's  budget because                                                                    
     the  actuarial completed  its review  after the  FY2015                                                                    
     Governor's budget was released.                                                                                            
                                                                                                                                
     Department of Administration                                                                                             
     Office of Public Advocacy                                                                                                
     General Fund                                                                                                             
     FY2015 December Budget: $25,197.7                                                                                        
     FY2015 Total Amendments: $193.0                                                                                          
     FY2015 Total: $25,390.7                                                                                                  
                                                                                                                              
     Caseload Capacity and Appellant Backlog                                                                                  
     Funding  to  accommodate  case load  increases  and  to                                                                    
     begin to address the  appellant backlog. This amendment                                                                    
     provides FY2015 funding based  on a FY2014 supplemental                                                                    
     request in the same amount.                                                                                                
                                                                                                                                
     Department of Administration                                                                                             
     Public Defender Agency                                                                                                   
     General Fund                                                                                                             
     FY2015 December Budget: $26,287.0                                                                                        
     FY2015 Total Amendments: $650.0                                                                                          
     FY2015 Total: $26,937.0                                                                                                  
                                                                                                                              
     Caseload Capacity and Appellant Backlog                                                                                  
     Funding  to  accommodate  case load  increases  and  to                                                                    
     begin to address the  appellant backlog. This amendment                                                                    
     provides FY2015 funding based  on a FY2014 supplemental                                                                    
     request in the same amount.                                                                                                
                                                                                                                                
9:24:23 AM                                                                                                                    
                                                                                                                                
Ms. Rehfeld discussed Lines 7 through 10 of the spread                                                                          
sheet:                                                                                                                          
                                                                                                                                
     Department of Natural Resources                                                                                          
     Agricultural Development                                                                                                 
     Statutory Designated Program Receipts                                                                                    
     FY2015 December Budget: $2,542.6                                                                                         
     FY2015 Total Amendments: $25.0                                                                                           
     FY2015 Total: $2,567.6                                                                                                   
                                                                                                                              
    Phytosanitary Certification for Export of Logs and                                                                        
     Plant Products                                                                                                           
     An  increase  in phytosanitary  inspections,  primarily                                                                    
     due  to  China's  increased  demand  for  Alaska  logs,                                                                    
     requires   additional  receipt   authority  to   charge                                                                    
     businesses for  the expense of  conducting inspections,                                                                    
     including travel, issuing  the official certificate and                                                                    
     documentation,  and  reimbursing  a  fee  to  the  U.S.                                                                    
     Department  of  Agriculture.  This  amendment  provides                                                                    
     FY2015 funding  based on an  FY2014 RPL request  in the                                                                    
     same amount.                                                                                                               
                                                                                                                                
     Department of Public Safety                                                                                              
     Special Projects                                                                                                         
     General Fund                                                                                                             
     FY2015 December Budget: $7,637.4                                                                                         
     FY2015 Total Amendments: $2,200.0                                                                                        
     FY2015 Total: $9,837.4                                                                                                   
                                                                                                                              
     Restore the Alaska Bureau of Highway Patrol                                                                              
     This amendment  restores $2.2 for the  Alaska Bureau of                                                                    
     Highway Patrol in the FY2015  budget. This funding will                                                                    
     retain dedicated resources  for enforcement in Alaska's                                                                    
     highway safety corridors.                                                                                                  
     University of Alaska                                                                                                     
     Various                                                                                                                  
     General Fund                                                                                                             
     1,686.5                                                                                                                  
     University Receipts                                                                                                      
     1,686.5                                                                                                                  
     FY2015 December Budget: $775,355.0                                                                                       
     FY2015 Total Amendments: $3,373.0                                                                                        
     FY2015 Total: $778,728.0                                                                                                 
                                                                                                                              
     United Academics Salary and Benefit Increases                                                                            
     The  negotiated compensation  increase  for salary  and                                                                    
     benefits for  United Academics  faculty includes  a two                                                                    
     percent  across-the-board  adjustment  and  a  one-time                                                                    
     lump sum payment  of $750 per eligible  unit member for                                                                    
     a system-wide total of $3,373.0.  This is a new request                                                                    
     for FY2015. It was not included in the FY2015                                                                              
     Governor's budget because the  contract was still under                                                                    
     negotiations.                                                                                                              
                                                                                                                                
     Fund Transfers                                                                                                           
     Permanent  Fund  Earnings  Reserve  to  Permanent  Fund                                                                  
     Principal                                                                                                                
     Permanent Fund Earnings Reserve Account                                                                                  
     FY2015 December Budget: $975,000.0                                                                                       
     FY2015 Amendments: -$10,000.0                                                                                            
     FY2015 Total: $965,000.0                                                                                                 
                                                                                                                              
     FY2015 December 31, 2013 Projection Update                                                                               
     The December 31, 2013 projection  for the transfer from                                                                    
     the  earnings reserve  account  (AS  37.13.145) to  the                                                                    
     principal of the Alaska permanent  fund is estimated to                                                                    
     be $965  million, down from  the $975  million estimate                                                                    
     in  the  October  31, 2013  projection  used  when  the                                                                    
     December budget was released.                                                                                              
                                                                                                                                
9:27:11 AM                                                                                                                    
                                                                                                                                
Senator Dunleavy  asked whether the United  Academics Salary                                                                    
and  Benefits  Insurance  would  be  covered  by  University                                                                    
funds.  Ms. Rehfeld  replied that  the  University had  been                                                                    
negotiating with  the bargaining unit and  that an agreement                                                                    
had  not been  in  place  when the  budget  was released  in                                                                    
December 2013. She  noted that half of the  request was paid                                                                    
for by university receipts and half state general fund.                                                                         
                                                                                                                                
Senator Dunleavy  understood that the University  was asking                                                                    
the state  for more money  to cover the  recently negotiated                                                                    
contract.  Ms. Rehfeld  said  that in  order  for all  state                                                                    
agencies  and state  bargaining unit  agreements to  go into                                                                    
effect the legislature would have to approve the funding.                                                                       
                                                                                                                                
9:28:39 AM                                                                                                                    
                                                                                                                                
Ms. Rehfeld  directed the committee's  attention to  page 3,                                                                    
line 11 of the spreadsheet:                                                                                                     
                                                                                                                                
     Department of Corrections                                                                                                
     Anchorage Correctional Complex                                                                                           
     General Fund                                                                                                             
     FY2015 December Budget: $27,568.3                                                                                        
     FY2015 Total Amendments: $0.0                                                                                            
     FY2015 Total: $27,568.3                                                                                                  
                                                                                                                              
     Delete General Fund for Federal Receipts                                                                                 
     Contingency                                                                                                              
     Delete the contingency language section appropriating                                                                      
     lost federal receipts with general funds.                                                                                  
                                                                                                                                
9:29:05 AM                                                                                                                    
                                                                                                                                
Senator  Dunleavy inquired  whether the  university did  the                                                                    
negotiations itself or if the  state negotiated contract for                                                                    
the University.  Ms. Rehfeld  responded that  the University                                                                    
itself conducted the negotiations.                                                                                              
                                                                                                                                
9:29:23 AM                                                                                                                    
                                                                                                                                
Senator Dunleavy noted that the  process differed for school                                                                    
districts. Ms.  Rehfeld explained that the  university was a                                                                    
state  agency. She  added that  through  the school  funding                                                                    
formula  was the  vehicle for  fund distribution  for school                                                                    
districts.                                                                                                                      
                                                                                                                                
Senator  Dunleavy  commented  that  there  would  be  future                                                                    
discussions  surrounding  the  generous  funding  for  adult                                                                    
training while  at the  same time  there would  be arguments                                                                    
about the amount of money  put into school districts to fund                                                                    
a constitutionally mandated program.                                                                                            
                                                                                                                                
9:31:22 AM                                                                                                                    
                                                                                                                                
Co-Chair  Meyer interjected  that school  districts had  the                                                                    
incentive  to  keep  costs down  because  their  funds  were                                                                    
limited. He  furthered that the University  negotiated their                                                                    
wages and benefits  knowing that the state would  pay it; he                                                                    
wondered whether  the University  had any incentive  to keep                                                                    
its costs down. Ms. Rehfeld  replied that the university was                                                                    
mindful of  the revenue  situation and  to what  other state                                                                    
bargaining units had agreed.                                                                                                    
                                                                                                                                
9:32:13 AM                                                                                                                    
                                                                                                                                
Vice-Chair Fairclough shared that  her subcommittee would be                                                                    
reviewing the labor negotiations.                                                                                               
                                                                                                                                
9:32:34 AM                                                                                                                    
                                                                                                                                
Senator  Hoffman shared  that Alaska  used to  have a  state                                                                    
operated school system,  but that SB 35 had  made the change                                                                    
for more  local control,  which had been  per the  wished of                                                                    
school districts of the time.                                                                                                   
                                                                                                                                
9:33:04 AM                                                                                                                    
                                                                                                                                
Co-Chair  Meyer  thought that  an  option  was to  fund  the                                                                    
amount  partially  and  make up  the  rest  through  student                                                                    
receipts.                                                                                                                       
                                                                                                                                
9:33:25 AM                                                                                                                    
                                                                                                                                
Ms. Rehfeld addressed Lines 12 and 13 of the spread sheet:                                                                      
                                                                                                                                
     Debt Services                                                                                                            
     General Obligation                                                                                                       
     General Fund                                                                                                             
     FY2015 December Budget: $88,120.2                                                                                        
     FY2015 Amendments: -$10,000.0                                                                                            
     FY2015 Total: $78,120.2                                                                                                  
                                                                                                                              
     FY2015 Funding for Series 2014A                                                                                          
     The FY2015 Governor's budget  estimated the 2014A issue                                                                    
     amount at  $300,000,000 with  an estimated  FY2015 debt                                                                    
     service to  be $20,000,000. Project cash  flow based on                                                                    
     actual  and projected  expenditures for  the authorized                                                                    
     infrastructure  projects was  updated in  February 2014                                                                    
     and   reflects   diminished  spending.   This   updated                                                                    
     analysis changes the estimated  size of the 2014A issue                                                                    
     to  $170,000,000.  This   amendment  reduces  the  debt                                                                    
     service amount  to $10,000,000, which  corresponds with                                                                    
     the reduction in planned issuance amount.                                                                                  
                                                                                                                                
     Debt Services                                                                                                            
     Jail Construction Reimbursement                                                                                          
     General Fund                                                                                                             
     FY2015 December Budget: $21,928.8                                                                                        
     FY2015 Amendments: -$512.3                                                                                               
     FY2015 Total: $21,416.5                                                                                                  
                                                                                                                              
     FY2015 Funding - Anchorage Jail                                                                                          
    As a result of a 2012 cash defeasance (Sec17, Ch5,                                                                          
     FSSLA2011,  P158, L7)  for principal  and interest  due                                                                    
     for  the  Municipality  of Anchorage  lease  (Anchorage                                                                    
     Jail),  sufficient  cash  is available  to  be  applied                                                                    
     toward  the  next  payments  due  in  August  2014  and                                                                    
     February  2015.  The  general fund  amount  needed  for                                                                    
     FY2015  debt  service  can   therefore  be  reduced  by                                                                    
     $512,276.                                                                                                                  
                                                                                                                                
Ms. Rehfeld spoke to Lines 1 through 5 of the capital                                                                           
amendment spread sheet (copy on file):                                                                                          
                                                                                                                                
     Commerce, Community and Economic Development                                                                             
     Appropriation                                                                                                            
     General Fund                                                                                                             
     $0.0                                                                                                                     
                                                                                                                              
     Alaska Energy Authority - Susitna-Watana Hydroelectric                                                                   
     Project                                                                                                                  
     This  amendment  updates   the  projected  future  year                                                                    
     funding  needed   to  reflect  a   FY2014  supplemental                                                                    
     request  in  the  amount of  $32.7  million  and  other                                                                    
     updated information.                                                                                                       
                                                                                                                                
     Department of Natural Resources                                                                                          
     Appropriation                                                                                                            
     Exxon Valdez Oil Spill Settlement                                                                                        
     $580.8                                                                                                                   
                                                                                                                              
     Exxon   Valdez   Oil   Spill   Trustee   Council   Land                                                                  
     Acquisition for                                                                                                          
     Public Access on Lower Kenai River                                                                                       
     This is  a new FY2015  project to purchase  the Stewart                                                                    
     and Beeson  parcels, located on the  lower Kenai River.                                                                    
     This  purchase will  allow  for riverbank  restoration,                                                                    
     provide  valuable  public  access, assist  in  resource                                                                    
     management, and provide benefits to local communities.                                                                     
                                                                                                                                
    Department of Transportation and Public Facilities                                                                        
     Allocation                                                                                                               
     Marine Highway Systems Fund                                                                                              
     $6,000.0                                                                                                                 
                                                                                                                              
    Alaska Marine Highway System - Vessel and Terminal                                                                        
     Overhaul and Rehabilitation                                                                                              
     The  FY2015 Governor  request is  being increased  from                                                                    
     $6,000,000  to  $12,000,000,  providing  an  additional                                                                    
     $6,000,000 from the Alaska Marine Highway System Fund.                                                                     
                                                                                                                                
    Department of Transportation and Public Facilities                                                                        
     Appropriation                                                                                                            
     Federal                                                                                                                  
     Receipts                                                                                                                 
     6,299.5                                                                                                                  
     General Fund                                                                                                             
     2,497.5                                                                                                                  
     Capital Improvement Project Receipts                                                                                     
     903.0                                                                                                                    
                                                                                                                              
     Aniak  High  School  White Alice  Communication  System                                                                  
     Site                                                                                                                     
     Clean-up                                                                                                                 
     This is  a new FY2015  capital project. The  Aniak High                                                                    
     School, located on a  former White Alice Communications                                                                    
     System  site,  requires  environmental  cleanup.  Costs                                                                    
     will be  shared by  the three  entities that  have used                                                                    
     the  site  -  the  federal  and  state  government  and                                                                    
     private contractors.                                                                                                       
                                                                                                                                
9:37:50 AM                                                                                                                    
                                                                                                                                
Vice-Chair  Fairclough  referenced  Line 5  of  the  capital                                                                    
amendments spreadsheet. She  queried the state's involvement                                                                    
and  asked whether  the difference  would be  picked by  the                                                                    
federal government.  Ms. Rehfeld replied that  the state had                                                                    
a  responsibility  to help  with  the  clean-up because  the                                                                    
Department  of Transportation  and  Public Facilities  owned                                                                    
the   property  and   the   Department   of  Education   was                                                                    
responsible for the school. She  added that a portion of the                                                                    
request  was repayment  to the  Department of  Environmental                                                                    
Conservation's response fund for initial clean-up.                                                                              
                                                                                                                                
Vice-chair Fairclough read from the project summary:                                                                            
                                                                                                                                
     Aniak  High  School  White Alice  Communication  System                                                                  
     Site                                                                                                                     
     Clean-up                                                                                                                 
     RN AMD 50905                                                                                                             
     $9,700,000                                                                                                               
                                                                                                                              
     Project Description/Justification:                                                                                     
     The former  White Alice Communications System  site was                                                                    
     developed and  operated by the United  States Air Force                                                                    
     (USAF) in the  mid 1950's through the  1970's. The land                                                                    
     was  transferred  to  the  state  in  1965,  under  the                                                                    
     Statehood  Act, with  the provision  that  the USAF  be                                                                    
     allowed to  operate it as  long as necessary.  In 1979,                                                                    
     the  USAF  issued  a  license   to  the  Kuspuk  School                                                                    
     District to renovate the building  for use as a school.                                                                    
     Polychlorinated  biphenyl (PCB)  contamination resulted                                                                    
     from  USAF  operations  and  school  district  building                                                                    
     renovation  activities.   The  PCB   contamination  was                                                                    
     discovered  in  1981  when   the  USAF  was  completing                                                                    
     relinquishment  of   its  interest  in   the  property.                                                                    
     Initial  cleanup work  was conducted  between 1981  and                                                                    
     1983,  but in  1997 the  cleanup was  determined to  be                                                                    
     incomplete as  PCBs were discovered in  the soil around                                                                    
     the building.                                                                                                              
                                                                                                                                
Vice-chair Fairclough thought that it was a shame that the                                                                      
federal government had left the state "holding the bag"                                                                         
once again.                                                                                                                     
                                                                                                                                
Co-Chair Meyer expected that there would be follow-up                                                                           
meetings to discuss the proposed amendments.                                                                                    
                                                                                                                                
9:39:41 AM                                                                                                                    
AT EASE                                                                                                                         
                                                                                                                                
9:42:46 AM                                                                                                                    
RECONVENED                                                                                                                      
                                                                                                                                
^FY15 GOVERNOR'S BUDGET OVERVIEW: DEPARTMENT OF FISH and                                                                      
GAME                                                                                                                          
                                                                                                                                
9:42:59 AM                                                                                                                    
                                                                                                                                
CORA CAMPBELL, COMMISSIONER, DEPARTMENT OF FISH AND GAME,                                                                       
spoke to the capital projects up for consideration,                                                                             
totaling $20.7 million.                                                                                                         
                                                                                                                                
9:44:21 AM                                                                                                                    
                                                                                                                                
Ms. Campbell spoke to the department's first priority:                                                                          
                                                                                                                                
     RN 57021                                                                                                                 
     Chinook Initiative                                                                                                       
     $10,000,000                                                                                                              
                                                                                                                              
     Brief Summary and Statement of Need:                                                                                   
     This  capital project  will continue  to implement  the                                                                    
     Department of  Fish and Game's Chinook  salmon research                                                                    
     plan, developed in response  to significant declines in                                                                    
     Chinook  salmon  returns experienced  statewide.  These                                                                    
     declines in Chinook salmon  production have resulted in                                                                    
     economic and  social hardships across  many communities                                                                    
     in rural and  urban areas of Alaska.  Results from this                                                                    
     project  will   be  used   to  better   understand  and                                                                    
     characterize   changing   productivity  and   abundance                                                                    
     trends. This  will ultimately lead to  improved Chinook                                                                    
     salmon stock assessment programs  so that Alaskans will                                                                    
     have improved harvest  opportunities, even during times                                                                    
     of low productivity.                                                                                                       
                                                                                                                                
     Project Description/Justification:                                                                                         
     The first phase  of this project began  in FY2014, with                                                                    
     projects  fielded statewide  to initiate  estimation of                                                                    
     adult   escapement,    stock-specific   harvests,   and                                                                    
     juvenile  smolt abundance  for  those indicator  stocks                                                                    
     with   gaps  in   information  in   these  areas.   The                                                                    
     department also  initiated investigations of  local and                                                                    
     traditional knowledge, a near  shore marine survey, and                                                                    
     provided funding  to the University of  Alaska to study                                                                    
     life history processes  in Chinook salmon. Continuation                                                                    
     of  funding  in  FY2015  and   beyond  is  required  to                                                                    
     successfully field these and  the remaining projects to                                                                    
     fill  significant  gaps  in our  knowledge  of  Chinook                                                                    
     salmon   statewide.  Chinook   salmon  are   critically                                                                    
     important to subsistence,  sport, and commercial users,                                                                    
     and to communities and  economies across Alaska. Recent                                                                    
     downturns  in  productivity  and abundance  of  Chinook                                                                    
     salmon  across the  state and  the resulting  hardships                                                                    
     have   highlighted  the   significant   need  for   the                                                                    
     department  to better  understand and  characterize the                                                                    
     changing productivity and  abundance trends for Chinook                                                                    
     salmon and to  identify actions that could  be taken to                                                                    
     lessen the  hardships experienced by Alaskans  that use                                                                    
     and depend on this resource.                                                                                               
                                                                                                                                
     To address  the decline,  the department tasked  a team                                                                    
     of agency scientists and  researchers with developing a                                                                    
     comprehensive Chinook  salmon research plan  to address                                                                    
     knowledge  gaps and  research needs.  They conducted  a                                                                    
     comprehensive  review of  Chinook  salmon programs  and                                                                    
     developed  a  report  entitled "Alaska  Chinook  Salmon                                                                    
     Knowledge Gaps  and Needs"  (Gap Analysis)  to identify                                                                    
     existing  knowledge  gaps,   identify  activities  that                                                                    
     could be undertaken to narrow  those gaps, and identify                                                                    
     the   range   of   potential  costs   associated.   The                                                                    
     department  hosted  the  Chinook  Salmon  Symposium  in                                                                    
     October 2012, and invited  state, federal, and academic                                                                    
     scientists  and  the  public, to  discuss  and  further                                                                    
     identify knowledge gaps and compile  a list of research                                                                    
     priorities  to  address  specific  questions  informing                                                                    
     observations   of   Chinook    salmon   abundance   and                                                                    
     productivity in Alaska. Results  from the Gap Analysis,                                                                    
     discussion  at   the  Chinook  Salmon   Symposium,  and                                                                    
     comments received on the Gap  Analysis were combined to                                                                    
     develop  the Chinook  salmon  research plan.  Documents                                                                    
     are available online at                                                                                                    
     http://www.adfg.alaska.gov/index.cfm?adfg=                                                                                 
     chinook_efforts_symposium.information                                                                                      
                                                                                                                                
     This  project will  fund the  next phase  of activities                                                                    
     identified  as needed  by the  Chinook salmon  research                                                                    
     plan and  initiated in the  first phase  during FY2014.                                                                    
     The  plan is  structured  on a  stock- specific,  life-                                                                    
     history   basis  for   twelve  indicator   stocks  from                                                                    
     Southeast Alaska  to the Arctic. These  stocks include:                                                                    
     Unuk, Stikine,  Taku, Chilkat, Copper,  Susitna, Kenai,                                                                    
     Karluk, Chignik, Nushagak,  Kuskokwim, and Yukon. Stock                                                                    
     assessments to  be funded include, for  these stocks, a                                                                    
     complete assessment of adult escapement and stock-                                                                         
     specific   harvests   in    all   relevant   fisheries,                                                                    
     assessment of juvenile Chinook  salmon smolt, local and                                                                    
     traditional   knowledge   studies,   nearshore   marine                                                                    
     surveys,  and   life  history  process   studies.  This                                                                    
     project is  closely aligned  with the  department's top                                                                    
     two core  services of  management and  stock assessment                                                                    
     and research.                                                                                                              
                                                                                                                                
9:47:11 AM                                                                                                                    
                                                                                                                                
Co-Chair  Meyer  queried  the total  cost  of  the  program.                                                                    
Commissioner Campbell  replied $30 million over  a five year                                                                    
period.                                                                                                                         
                                                                                                                                
Co-Chair Meyer  thought that the  total cost was  very high.                                                                    
Commissioner Campbell  asserted that while it  seemed like a                                                                    
large amount  of money, the  economic impact of  the species                                                                    
to the state was greater.  She contended that the investment                                                                    
was an important  one for the state,  both for understanding                                                                    
the causes  the decline and  to be  able to be  confident it                                                                    
the  management  in  order   to  provide  opportunities  for                                                                    
harvest in a period of low abundance.                                                                                           
                                                                                                                                
9:48:49 AM                                                                                                                    
                                                                                                                                
Senator Hoffman believed  that the proposal would  go a long                                                                    
way  in meeting  the constitutionally  mandated requirements                                                                    
to maintain fish stocks to maximum sustainability.                                                                              
                                                                                                                                
9:49:31 AM                                                                                                                    
                                                                                                                                
Senator Dunleavy  asked how the  allocations for  each river                                                                    
were decided on. Commissioner Campbell  replied that a draft                                                                    
gap  analysis  had  been conducted  for  each  river  system                                                                    
concerning   adult  abundance,   adult  survival,   juvenile                                                                    
survival and  juvenile abundance.   She said that  after the                                                                    
analysis  had been  conducted a  public  symposium had  been                                                                    
held in  Anchorage. She stated that  through those processes                                                                    
it was decided where the dollars would be best spent.                                                                           
                                                                                                                                
9:51:03 AM                                                                                                                    
                                                                                                                                
Senator  Olson  expressed  concern  with  the  cost  of  the                                                                    
program.  He asked  when positive  results from  the program                                                                    
could  be expected.  Commissioner Campbell  thought that  it                                                                    
was important  to remember to take  a multi-faceted approach                                                                    
to what was happening with  Chinook salmon. She relayed that                                                                    
the  research  initiative was  on  component,  but that  the                                                                    
department  needed to  take  every  opportunity possible  to                                                                    
provide   harvest  opportunity   on   other  species   where                                                                    
possible. She  asserted that there  were other  aspects then                                                                    
research to the program. She  stressed that it was important                                                                    
to look  at every stage of  the lifecycle to get  a complete                                                                    
picture. She said  that the research would result  in a more                                                                    
precise  assessment program  which would  pay dividends  for                                                                    
in-season management on an annual basis.                                                                                        
                                                                                                                                
9:53:56 AM                                                                                                                    
                                                                                                                                
Senator Bishop  thought that as  relevant data  was gathered                                                                    
it  should quickly  translate  into solutions.  Commissioner                                                                    
Campbell agreed.  She assured the committee  that the intent                                                                    
was not  to wait until  the end  to consider the  results of                                                                    
the have  a five-year  research program. She  explained that                                                                    
some research  would take multi-year  data sets in  order to                                                                    
learn from them, but some would have immediate pay-offs.                                                                        
                                                                                                                                
9:55:18 AM                                                                                                                    
                                                                                                                                
KEVIN BROOKS,  DEPUTY COMMISSIONER,  DEPARTMENT OF  FISH AND                                                                    
GAME, continued the requests:                                                                                                   
                                                                                                                                
     RN 58645                                                                                                                 
     Intensive Game Management Research and Implementation                                                                    
     $4,000,000                                                                                                               
                                                                                                                              
     Brief Summary and Statement of Need:                                                                                   
     This request  will allow the department  to continue to                                                                    
     implement  intensive  management   programs  and  their                                                                    
     associated  monitoring program  using a  combination of                                                                    
     federal  funds  and  general funds  to  conduct  needed                                                                    
     baseline  research   and  monitoring  as   mandated  by                                                                    
     policy.  General funds  are  requested  to perform  the                                                                    
     actual  predation  control   to  prohibit  any  federal                                                                    
     influence.                                                                                                                 
                                                                                                                                
     Project Description/Justification:                                                                                     
     Intensive management  involves pre and  post population                                                                    
     studies  and inventory  determinations as  well as  the                                                                    
     implementation  of  actual  predator  control.  General                                                                    
     funds  are   most  appropriate  for   predator  control                                                                    
     activities  whereas  federal/state  matched  funds  are                                                                    
     most appropriate for the  biological work. The division                                                                    
     also intends  to conduct  a subsistence  migratory bird                                                                    
     survey  under this  capital improvement  project (CIP).                                                                    
     Federal  funding  for  this   work  will  come  through                                                                    
     federal  Pittman-Robertson  (PR)  Wildlife  Restoration                                                                    
     funding. The  division continues to  foresee increasing                                                                    
     apportioned amounts  of PR funding  to Alaska.  Gun and                                                                    
     ammunition sales  have continued to increase  since the                                                                    
     presidential  election of  2012.  Recent history  would                                                                    
     suggest  a  drop  in  gun  sales  after  the  election,                                                                    
     however due to national  discussions regarding guns and                                                                    
     gun  control,  gun  and ammunition  sales  continue  to                                                                    
     climb and as a result  revenue to the PR fund continues                                                                    
     to climb. The  result is even greater  amount of excise                                                                    
     tax  revenue   for  Wildlife  Restoration   and  Hunter                                                                    
     Education  and   funds  made  available   for  wildlife                                                                    
     management  by  all states.  This  CIP  will allow  the                                                                    
     department to  spend these  funds while  not increasing                                                                    
     the base operating budget.                                                                                                 
                                                                                                                                
     RN 58647                                                                                                                 
     Habitat Enhancement for Wildlife                                                                                         
     $1,000,000                                                                                                               
                                                                                                                              
     Brief Summary and Statement of Need:                                                                                   
     Habitat  manipulation  can  be an  effective  means  to                                                                    
     maintain or increase  wildlife populations. By treating                                                                    
     vegetation  to  enhance   winter  browse,  specifically                                                                    
     birch,   aspen  and   willow,  moose   populations  may                                                                    
     increase over  time to  again support  hunter interests                                                                    
     and  viewing  opportunities  at   a  viable  level.  In                                                                    
     addition  to  the benefits  of  this  program to  local                                                                    
     users,  tourism  and  other businesses  are  likely  to                                                                    
     realize  benefits  as  well. This  capital  improvement                                                                    
     project  (CIP)  provides  for   a  variety  of  habitat                                                                    
     enhancement projects across the state.                                                                                     
                                                                                                                                
     Project Description/Justification:                                                                                     
     One project  to be funded  is an interagency  effort to                                                                    
     enhance moose  habitat on the  Kenai Peninsula.  Due to                                                                    
     the declining  moose populations, Alaska  Department of                                                                    
     Fish   and   Game   (ADF&G),   Division   of   Wildlife                                                                    
     Conservation  (division),  seeks   to  improve  habitat                                                                    
     quality, with a focus on Game                                                                                              
     Management  Unit 15A.  Through  collaboration with  the                                                                    
     Kenai  Peninsula   Borough,  U.S.  Fish   and  Wildlife                                                                    
     Service,  Division  of  Forestry  and  others,  we  can                                                                    
     integrate  management  of   wildland  fire,  mechanical                                                                    
     manipulations  and  prescribed  fire into  a  strategic                                                                    
     approach to improve moose habitat.                                                                                         
                                                                                                                                
     ADF&G  is requesting  $1,000,000 to  facilitate habitat                                                                    
     enhancement projects by  partnering with other agencies                                                                    
     to integrate  mechanical treatments  and fire  onto the                                                                    
     landscape  in  a  strategic manner.  Funding  would  be                                                                    
     directed  toward   private  contractors   operating  on                                                                    
     public   and  private   land  along   with  wild   land                                                                    
     firefighters  to support  interagency burn  operations.                                                                    
     This  time frame  offers agency  personnel the  time to                                                                    
     plan  and  coordinate implementation  across  ownership                                                                    
     boundaries. ADF&G  anticipates that  over 80%  of these                                                                    
     funds  would be  directed at  project implementation  -                                                                    
     acres  treated on  the  ground.  Remaining funds  would                                                                    
     support  seedlings,  cooperative assistance  and  other                                                                    
     supplies.                                                                                                                  
                                                                                                                                
     Funding  for  this  work   will  come  through  federal                                                                    
     Pittman-Robertson  (PR)  Wildlife Restoration  funding.                                                                    
     The   division   continues    to   foresee   increasing                                                                    
     apportioned amounts  of PR  funding to  Alaska. Habitat                                                                    
     enhancement is an eligible  activity provided the state                                                                    
     meets   compliance  requirements   from  the   National                                                                    
     Environmental Policy Act (NEPA)  and the State Historic                                                                    
     Preservation  Act.   Gun  and  ammunition   sales  have                                                                    
     continued to  increase since the  presidential election                                                                    
     of 2012.  Recent history  would suggest  a drop  in gun                                                                    
     sales  after  the  election, however  due  to  national                                                                    
     discussions  regarding guns  and gun  control, gun  and                                                                    
     ammunition  sales continue  to  climb and  as a  result                                                                    
     revenue to the  PR Fund continues to  climb. The result                                                                    
     is  even  greater  amount of  excise  tax  revenue  for                                                                    
     Wildlife  Restoration  made  available  for  wild  life                                                                    
     management  by  all states.  This  CIP  will allow  the                                                                    
     department to  spend these  funds while  not increasing                                                                    
     the base operating budget.                                                                                                 
                                                                                                                                
9:58:28 AM                                                                                                                    
                                                                                                                                
Senator Dunleavy understood the appropriation was for $1                                                                        
million. Mr. Brooks responded in the affirmative.                                                                               
                                                                                                                                
Senator Dunleavy probed interagency cooperation. Mr. Brooks                                                                     
replied that the work was a collaborative effort. He said                                                                       
he could get back to the committee with specifics.                                                                              
                                                                                                                                
9:59:44 AM                                                                                                                    
                                                                                                                                
Mr. Brooks continued with the capital requests:                                                                                 
                                                                                                                                
     RN 30432                                                                                                                 
     Sports Fish Recreational Boating Access                                                                                  
     $3,000,000                                                                                                               
                                                                                                                              
     Brief Summary and Statement of Need:                                                                                   
     This request  authorizes the Division of  Sport Fish to                                                                    
     continue  to construct  and upgrade  recreational power                                                                    
     boating  and sport  fish access  facilities state  wide                                                                    
     using  Sport   Fish  Restoration   apportionment  funds                                                                    
     comprised  of  75%  federal  assistance  and  25%  non-                                                                    
     federal match. Federal regulations  require that 15% of                                                                    
     the   annual    Sport   Fish    Restoration   (Dingell-                                                                    
     Johnson/Wallop-Breaux Amendment)  apportionment will be                                                                    
     dedicated to  projects that benefit  recreational power                                                                    
     boaters.  Projects   include  boat   launches,  mooring                                                                    
     floats,   parking   lots,  restrooms,   fish   cleaning                                                                    
     facilities, and  other services. This  request proposes                                                                    
     to replace Fish and Game  Funds (FGF) with general fund                                                                    
     match due to the decline of FGF revenues for FY2015.                                                                       
                                                                                                                                
     RN 58597                                                                                                                 
     Storage  Structure for  Hunter  Education and  Shooting                                                                  
     Range Programs                                                                                                           
     $800,000                                                                                                                 
                                                                                                                              
     Brief Summary and Statement of Need:                                                                                   
     Storage  structures are  needed  to  assist the  Hunter                                                                    
     Education and Shooting  Range programs. Metal buildings                                                                    
     are  proposed  for  construction at  the  Rabbit  Creek                                                                    
     Shooting Park  (Anchorage) and by the  Fairbanks Indoor                                                                    
     Shooting  Range.  Training   materials,  shotgun  range                                                                    
     birds, lead  filters, and trailers for  mobile training                                                                    
     are stored in various  places around Raspberry Road and                                                                    
     the College Road campuses.                                                                                                 
                                                                                                                                
     Prior Funding History / Additional Information:                                                                            
     Secure storage  is especially needed for  the Fairbanks                                                                    
     range as filters used to  trap lead are changed monthly                                                                    
     and  must  be  stored  before  supervised  disposal.  A                                                                    
     mobile  training   trailer  requires   covered  storage                                                                    
     during the winter months in  Fairbanks. It is currently                                                                    
     stored  in an  airplane hangar  by a  program volunteer                                                                    
     who is selling the hanger.                                                                                                 
                                                                                                                                
     Project Description/Justification:                                                                                     
     The  Hunter  Education   program  is  coordinated  from                                                                    
     Anchorage and Fairbanks and  tasks include the shipment                                                                    
     of   training  materials   (guns,   books,  vests)   to                                                                    
     volunteer instructors statewide.  At present, materials                                                                    
     are  not  stored  in   any  central  location,  greatly                                                                    
     reducing  any  work   efficiency.  Materials  that  are                                                                    
     currently stored are in  conex type shipping containers                                                                    
     that are  not designed  for dry storage.  The buildings                                                                    
     will be  located on  land already  owned by  the State.                                                                    
     Federal funding through Hunter  Education Section 4C of                                                                    
     the  Pittman-Roberts  on Wildlife  Restoration  program                                                                    
     can be acquired. An initial  grant proposal to the U.S.                                                                    
     Fish &  Wildlife Service will  be submitted  during the                                                                    
     fall  2013  to  secure  40% of  the  funding.  A  grant                                                                    
     amendment   in  2014   after  new   apportionments  are                                                                    
     distributed  will add  the additional  funds up  to the                                                                    
     amount  of this  appropriation.  The Fish  & Game  Fund                                                                    
     will  be used  as the  required match  for the  federal                                                                    
     funds.                                                                                                                     
                                                                                                                                
     RN 43322                                                                                                                 
     Facilities,  Vessels and  Aircraft Maintenance,  Repair                                                                  
     and Upgrades.                                                                                                            
     $500,000                                                                                                                 
                                                                                                                              
     Brief Summary and Statement of Need:                                                                                   
     This  annual  request  funds  repair,  maintenance  and                                                                    
     renovation of  department facilities statewide  as well                                                                    
     as   vessel  and   aircraft  repair   and  maintenance.                                                                    
     Facilities  funding  is  managed  by  the  Division  of                                                                    
     Administrative  Services (DAS),  vessel funding  by the                                                                    
     Division of  Commercial Fisheries and  aircraft funding                                                                    
     by the  Divisions of Commercial Fisheries  and Wildlife                                                                    
     Conservation.                                                                                                              
                                                                                                                                
10:02:43 AM                                                                                                                   
                                                                                                                                
Vice-Chair  Fairclough  asked  whether  the  department  had                                                                    
partnered  with the  University on  researching some  of the                                                                    
repair  issues.  Mr.  Brooks  replied  that  the  department                                                                    
worked  with   the  University  as   well  as   the  federal                                                                    
government when necessary.                                                                                                      
                                                                                                                                
10:03:34 AM                                                                                                                   
                                                                                                                                
     RN 45482                                                                                                                 
    Deferred Maintenance, Renewal, Repair and Equipment                                                                       
     $1,400,000                                                                                                               
                                                                                                                              
     Brief Summary and Statement of Need:                                                                                   
     Funding  is requested  to address  deferred maintenance                                                                    
     needs  for   statewide  fish  passages,   counting  and                                                                    
     sampling   sites,   or   weir   facilities;   statewide                                                                    
     warehouse/workshop facilities; statewide small field                                                                       
     site/camp facilities.                                                                                                      
                                                                                                                                
Mr. Brooks  stated that the appropriation  request contained                                                                    
four allocations:                                                                                                               
                                                                                                                                
     Fairbanks Regional Office Compound -                                                                                       
     $750,000                                                                                                                   
     Statewide fish passages, counting & sampling sites, or                                                                     
     weir facilities -                                                                                                          
     $250,000                                                                                                                   
     Statewide warehouse/workshop facilities -                                                                                  
     $250,000                                                                                                                   
     Statewide small field site/camp facilities - $150,000                                                                      
                                                                                                                                
10:05:30 AM                                                                                                                   
AT EASE                                                                                                                         
                                                                                                                                
10:08:34 AM                                                                                                                   
RECONVENED                                                                                                                      
                                                                                                                                
^FY15  GOVERNOR'S BUDGET  OVERVIEW: DEPARTMENT  OF EDUCATION                                                                  
and EARLY DEVELOPMENT                                                                                                         
                                                                                                                                
10:08:51 AM                                                                                                                   
                                                                                                                                
MICHAEL  HANLEY, COMMISSIONER,  DEPARTMENT OF  EDUCATION AND                                                                    
EARLY DEVELOPMENT, introduced himself.                                                                                          
                                                                                                                                
10:09:11 AM                                                                                                                   
                                                                                                                                
HEIDI    TESHNER,    DIRECTOR,   ADMINISTRATIVE    SERVICES,                                                                    
DEPARTMENT OF EDUCATION AND EARLY  DEVELOPMENT, spoke to the                                                                    
PowerPoint presentation,  "Alaska Department of  Education &                                                                    
Early Development:  FY2015 Capital Budget  Overview"(copy on                                                                    
file). She spoke to Slide 2:                                                                                                    
                                                                                                                                
   · Four requests in SB119 totaling $53.2 million:                                                                             
        o State Library, Archives and Museum (SLAM)                                                                             
          Facility Construction                                                                                                 
        o Kwethluk K-12 Replacement School - Kasayulie                                                                          
        o Alaska Digital Teaching Initiative Three-Year                                                                         
          Demonstration Project                                                                                                 
        o Mt. Edgecumbe High School Deferred Maintenance                                                                        
                                                                                                                                
Ms. Teshner addressed Slide 3:                                                                                                  
                                                                                                                                
   · State Library, Archives and Museum (SLAM) Facility                                                                         
     Construction Funding: $15.0 million UGF                                                                                    
        o Partial funding for remaining construction phase.                                                                     
        o Remaining funding will be used for construction                                                                       
          completion,     exhibits,     furnishings,     and                                                                    
          landscaping.                                                                                                          
        o Total of $102.95 million has been appropriated to                                                                     
          date.                                                                                                                 
        o $22.215 million additional needed by                                                                                  
        o July 1, 2014 to finish project on-time                                                                                
        o (July 2016) with no increased costs.                                                                                  
                                                                                                                                
Ms. Teshner  stated that  the new  building was  designed to                                                                    
last 100  years and would  pull together the  five locations                                                                    
of  the   division  into  one   building  and   enhance  the                                                                    
division's  goals to  protect Alaska's  historical treasures                                                                    
and allow growth in the collection.                                                                                             
                                                                                                                                
10:10:53 AM                                                                                                                   
                                                                                                                                
Vice-Chair Fairclough wanted to know  how much the state had                                                                    
additionally  paid by  not funding  the 2014  appropriation.                                                                    
She  asked how  much  the  one year  delay  was costing  the                                                                    
state.                                                                                                                          
                                                                                                                                
10:11:51 AM                                                                                                                   
                                                                                                                                
LINDA THIBODEAU, DIRECTOR,  DIVISION OF LIBRARIES, ARCHIVES,                                                                    
AND MUSEUMS, DEPARTMENT OF  EDUCATION AND EARLY DEVELOPMENT,                                                                    
replied that the additional cost was $7 million.                                                                                
                                                                                                                                
10:12:04 AM                                                                                                                   
                                                                                                                                
Vice-Chair Fairclough recalled that  last year's request had                                                                    
been short-funded,  she queried  what the request  had been.                                                                    
Ms. Thibodeau  replied that the  governor's request  was $20                                                                    
million  but  that the  need  at  that  point had  been  $50                                                                    
million.                                                                                                                        
                                                                                                                                
Ms.  Thibodeau  responded that  the  net  difference in  the                                                                    
total costs needed was $37.215 million.                                                                                         
Vice-Chair  Fairclough  inquired   if  $37.215  million  was                                                                    
needed to complete the project.  Ms. Thibodeau added that it                                                                    
was  the  amount  needed   for  completion  with  guaranteed                                                                    
maximum pricing.                                                                                                                
                                                                                                                                
Vice-Chair Fairclough  pointed out  for the record  that the                                                                    
state had cost itself $7 million by waiting.                                                                                    
                                                                                                                                
10:13:27 AM                                                                                                                   
                                                                                                                                
Co-Chair Meyer  understood that  the governor's  request for                                                                    
the project was $15 million.  Ms. Thibodeau replied yes, and                                                                    
that the total need for the building was $37.215 million.                                                                       
                                                                                                                                
Co-Chair Meyer asked  whether the state was  losing money by                                                                    
not funding the full $37.215 million in FY15.                                                                                   
                                                                                                                                
Ms. Thibodeau  explained that the  red cap on the  bar graph                                                                    
on  Slide  4 indicated  the  department's  best estimate  of                                                                    
additional cost requirements.                                                                                                   
                                                                                                                                
10:14:38 AM                                                                                                                   
                                                                                                                                
Vice-Chair Fairclough  felt that the project  was an example                                                                    
of how  phase funded projects  were a problem.  She believed                                                                    
that the project should be fully funded.                                                                                        
                                                                                                                                
10:15:41 AM                                                                                                                   
                                                                                                                                
Co-Chair Meyer  was unsure  if it the  $37 million  could be                                                                    
spent in one year. He  expressed a commitment to the project                                                                    
but was confused  about the additional cost  of $9.8 million                                                                    
reflected on  Slide 4.  Ms. Thibodeau  said that  there were                                                                    
various parts to the additional  cost and that details could                                                                    
be  provided at  a later  date. She  added that  the $37.215                                                                    
would not  be spent  all in one  year, but  rather contracts                                                                    
would be  finalized to get  a guaranteed maximum  price that                                                                    
would finish the building by 2016.                                                                                              
                                                                                                                                
10:16:45 AM                                                                                                                   
                                                                                                                                
Ms. Teshner spoke to Slide 5:                                                                                                   
                                                                                                                                
   · Kwethluk K-12 Replacement School - Kasayulie: $31.5                                                                        
     million REAA Fund (DGF)                                                                                                    
        o For design and construction of a K-12 replacement                                                                     
          school.                                                                                                               
        o Total cost: $57.7 million                                                                                             
        o State Share: $56.5 million                                                                                            
        o $25.0 million of State Share appropriated in                                                                          
          FY2014 from the REAA Fund for design, planning,                                                                       
          and foundation work.                                                                                                  
10:17:38 AM                                                                                                                   
                                                                                                                                
Senator Dunleavy  queried what  the anticipated life  of the                                                                    
building. Ms.  Teshner replied  that she  did not  have that                                                                    
information with her.                                                                                                           
                                                                                                                                
10:18:00 AM                                                                                                                   
                                                                                                                                
Commissioner Hanley turned to Slide 6:                                                                                          
                                                                                                                                
   · Alaska    Digital   Teaching    Initiative   Three-Year                                                                    
     Demonstration Project: $5.0 million UGF                                                                                    
        o Remove barriers, increase opportunity, and access                                                                     
          for Alaska's students.                                                                                                
        o Develop high quality, interactive courses to                                                                          
          middle school and high school students focused on                                                                     
          science,   technology,   engineering,   and   math                                                                    
          (STEM).                                                                                                               
        o Funding to support:                                                                                                   
        o Digital Innovation Districts                                                                                          
        o Digital Teaching Academy                                                                                              
        o Digital Course Development                                                                                            
        o Program Assessment                                                                                                    
                                                                                                                                
Commissioner Hanley  relayed that he goal  of the initiative                                                                    
was  to  utilize  working models  represented  in  different                                                                    
districts  around the  state to  reach out  and address  the                                                                    
needs of student that did not have the same access.                                                                             
                                                                                                                                
10:19:32 AM                                                                                                                   
                                                                                                                                
Commissioner Hanley  turned to Slide  7, which was a  map of                                                                    
the  state  with  symbolic  representation  of  the  current                                                                    
digital conditions  in the state.  He continued to  Slide 8,                                                                    
which illustrated that hope for conditions in the future.                                                                       
                                                                                                                                
10:21:49 AM                                                                                                                   
                                                                                                                                
Co-Chair  Meyer  asked  what  the   red  dots  on  the  maps                                                                    
represented.   Commissioner  Hanley   responded  that   they                                                                    
represented the hub. He noted  that they had not been placed                                                                    
in particular communities.  He shared that the  plan was put                                                                    
out grants  and identify three  to five districts  that were                                                                    
already  doing  similar work,  and  help  to strengthen  and                                                                    
expand.                                                                                                                         
                                                                                                                                
Co-Chair Meyer understood  that the plan was  to provide all                                                                    
of Alaska  with access  to the  courses required  to receive                                                                    
scholarships  with the  University  of Alaska.  Commissioner                                                                    
Hanley  replied   yes.  He  noted  that   the  courses  were                                                                    
currently available through the Alaska Learning Network.                                                                        
                                                                                                                                
10:23:05 AM                                                                                                                   
                                                                                                                                
Vice-Chair  Fairclough  referenced  a  broadband  study  and                                                                    
survey, as  well as Senator  Olson's bill to make  a minimum                                                                    
threshold for broadband access.  She asked whether there was                                                                    
a broadband  study that could tell  the legislature specific                                                                    
needs  by  location.  Commissioner  Hanley  replied  no.  He                                                                    
explained   that  the   department  was   not  a   broadband                                                                    
developer. He  relayed that  the department  was researching                                                                    
models built on its  current capacity while recognizing that                                                                    
broadband was a statewide  issue. He declared that increased                                                                    
broadband  would  enhance  lives and  education  across  the                                                                    
state. He  communicated that the  department was  looking to                                                                    
develop models  within the capacity already  established. He                                                                    
furthered  that  43  of  the  state's  53  school  districts                                                                    
participated in  online courses; the  10 that were  not were                                                                    
not doing so  because they did not have  access, but because                                                                    
they had other models in place.                                                                                                 
                                                                                                                                
Vice-Chair  Fairclough   thought  that  a  study   had  been                                                                    
conducted during the summer of  2013 that examined broadband                                                                    
cost  drivers   for  education.  She  asked   who  would  be                                                                    
responsible  for performing  the study.  Commissioner Hanley                                                                    
replied  that the  Broadband Taskforce  had  done some  work                                                                    
through the  Department of Commerce, Community  and Economic                                                                    
Development. He  related that the  university had  done work                                                                    
specifically involving  the ability  of districts  to access                                                                    
online testing.                                                                                                                 
                                                                                                                                
Vice-Chair Fairclough  thought that the better  informed the                                                                    
legislature was on  the capacity at regional  hubs, the more                                                                    
likely funds would be used in the best way possible.                                                                            
                                                                                                                                
10:27:24 AM                                                                                                                   
                                                                                                                                
Senator Dunleavy  thought that the state  needed a broadband                                                                    
technology audit. He thought that  this would help the state                                                                    
understand where  the gaps were  and where the need  was. He                                                                    
wondered whether  schools would be  technologically prepared                                                                    
for broadband in their school.                                                                                                  
                                                                                                                                
Commissioner Hanley agreed. He  believed that the department                                                                    
could  collaborate with  others in  order to  gather further                                                                    
information.                                                                                                                    
                                                                                                                                
10:30:28 AM                                                                                                                   
                                                                                                                                
Ms. Teshner turned to Slide 9:                                                                                                  
                                                                                                                                
   · Mount   Edgecumbe    High   School    (MEHS)   Deferred                                                                    
     Maintenance: $1.7 million UGF                                                                                              
        o Funding for projects according to the Capital                                                                         
          Improvement Projects (CIP) Master Plan, or as                                                                         
          MEHS facility management identifies health and                                                                        
          safety priorities.                                                                                                    
        o Remaining projects on the CIP Master Plan are                                                                         
          estimated    at    $22.5   million,    which    is                                                                    
          approximately $4.5 million per year for FY2015                                                                        
          through FY2020.                                                                                                       
                                                                                                                                
Co-Chair Meyer asked  whether the last bullet  point was the                                                                    
major maintenance list. Ms. Teshner replied no.                                                                                 
                                                                                                                                
Co-Chair Meyer  inquired where  the major  maintenance could                                                                    
be found. Ms.  Teshner replied that there  were currently no                                                                    
projects in  the governor's budget on  the major maintenance                                                                    
list. She noted that it  was on the department's website and                                                                    
could be provided at a later date.                                                                                              
                                                                                                                                
Co-Chair Meyer  thought that it  was important  to recognize                                                                    
and continue to work down the major maintenance list.                                                                           
                                                                                                                                
10:32:12 AM                                                                                                                   
                                                                                                                                
Senator Hoffman queried the total  cost of the current major                                                                    
maintenance  list. Ms.  Teshner  responded  that there  were                                                                    
currently  102  items  on the  major  maintenance  list  the                                                                    
state's share of which was $183.5 million.                                                                                      
                                                                                                                                
10:33:03 AM                                                                                                                   
                                                                                                                                
Senator  Dunleavy  understood  the  list  was  current.  Ms.                                                                    
Teshner  replied yes.  Senator  Dunleavy  asserted that  the                                                                    
list  did not  necessarily  reflect all  of the  maintenance                                                                    
issues  involving schools  in the  state.  Ms. Teshner  said                                                                    
that was correct.                                                                                                               
                                                                                                                                
10:33:14 AM                                                                                                                   
Co-Chair Meyer requested a hard copy of the list.                                                                               
                                                                                                                                
10:33:35 AM                                                                                                                   
                                                                                                                                
Senator Olson  did not understand why  the major maintenance                                                                    
list was  not at  least partially  funded in  the governor's                                                                    
budget. Commissioner  Hanley replied  that the  governor had                                                                    
made the decision in light  of the state's current financial                                                                    
situation. He  stressed that their  absence from  the budget                                                                    
did  not  mean  that  they   were  not  very  important  and                                                                    
necessary items.                                                                                                                
                                                                                                                                
Senator Olson expressed  concern that the list  had not been                                                                    
included in the request.                                                                                                        
                                                                                                                                
10:35:06 AM                                                                                                                   
                                                                                                                                
Co-Chair   Meyer  thought   that  the   budget  was   light.                                                                    
Commissioner Hanley agreed.                                                                                                     
                                                                                                                                
10:36:02 AM                                                                                                                   
AT EASE                                                                                                                         
                                                                                                                                
10:41:53 AM                                                                                                                   
RECONVENED                                                                                                                      
                                                                                                                                
^FY15  GOVERNOR'S BUDGET  OVERVIEW:  DEPARTMENT OF  REVENUE/                                                                  
ALASKA HOUSING FINANCE CORPORATION                                                                                            
                                                                                                                                
10:42:11 AM                                                                                                                   
                                                                                                                                
JERRY   BURNETT,   DIRECTOR,  DIVISION   OF   ADMINISTRATIVE                                                                    
SERVICES,   DEPARTMENT  OF   REVENUE,  testified   that  the                                                                    
department  had   two  capital  project   requests  totaling                                                                    
$370,100;  $81,624  was  general fund  match,  $158,466  was                                                                    
federal funds and $130,000 was  the Permanent Fund Dividend.                                                                    
The  said  that  both  requests  were  annual  requests  for                                                                    
personal  computers, printers  and service  storage devices.                                                                    
He said  that the request  had been  funded for the  past 10                                                                    
years.                                                                                                                          
                                                                                                                                
10:44:14 AM                                                                                                                   
                                                                                                                                
BRYAN  BUTCHER,   CHIEF  EXECUTIVE  OFFICER   AND  EXECUTIVE                                                                    
DIRECTOR, ALASKA HOUSING  FINANCE CORPORATION, DEPARTMENT OF                                                                    
REVENUE, commented that the housing  market in the state was                                                                    
the tightest  it had been  since the recession in  the early                                                                    
to middle  1980s. He said that  people were paying 50  to 60                                                                    
percent of  their salaries to  stay in their  apartments. He                                                                    
assured the committee that the  corporation was aware of the                                                                    
problem and was looking into solutions.                                                                                         
                                                                                                                                
10:47:02 AM                                                                                                                   
                                                                                                                                
Co-Chair Meyer noted  that some believed that a  way to help                                                                    
with the affordable housing would  be to go forward with the                                                                    
Knik  Arm Bridge  and Toll  Authority  (KABATA) project.  He                                                                    
wondered if  that was a  project that the  corporation would                                                                    
be willing  to take on.  Mr. Butcher  replied that it  was a                                                                    
possibility.                                                                                                                    
                                                                                                                                
Co-Chair Meyer queried the department's accomplishments.                                                                        
                                                                                                                                
10:48:20 AM                                                                                                                   
                                                                                                                                
LES  CAMPBELL,  DIRECTOR,  BUDGET,  ALASKA  HOUSING  FINANCE                                                                    
CORPORATION,  presented a  PowerPoint presentation,  "Budget                                                                    
Presentation  to  Senate   Finance  Committee  February  20,                                                                    
2014"(copy on file.) He spoke to Slide 1:                                                                                       
                                                                                                                                
     RN 54796                                                                                                                 
     Domestic Violence Designation Program (Empowering                                                                        
     Choice Housing Program)                                                                                                  
     $2,000,000                                                                                                               
                                                                                                                                
     Purpose: Provide a  referral-based transitional housing                                                                  
     assistance  program,  the   Empowering  Choice  Housing                                                                    
     Program (ECHP),  designed to meet the  housing needs of                                                                    
     victims of domestic violence and sexual assault.                                                                           
                                                                                                                                
     Projected outcome:                                                                                                       
     •Rental assistance for up to 254 households statewide;                                                                     
     •Provide voucher assistance in twelve communities; and                                                                     
     •Enhances    Governor    Parnell's    Choose    Respect                                                                    
     initiative.                                                                                                                
                                                                                                                                
10:50:02 AM                                                                                                                   
                                                                                                                                
Senator  Dunleavy noted  that the  funds  were public  funds                                                                    
that would  be used  for vouchers.  Mr. Campbell  replied in                                                                    
the affirmative.                                                                                                                
                                                                                                                                
10:50:31 AM                                                                                                                   
                                                                                                                                
Vice-Chair Fairclough  believed that  the item should  be in                                                                    
the operating  budget. She recalled that  the department had                                                                    
requested  funding for  the program  in  FY14 because  those                                                                    
that were experiencing domestic  violence were being given a                                                                    
higher priority that other homeless  people on the list. She                                                                    
believed that if  the state were going to  expand the amount                                                                    
of  people  that  could access  housing  through  a  voucher                                                                    
system,  the  item belonged  in  the  operating budget.  Mr.                                                                    
Campbell replied that the timing  of the program had stopped                                                                    
the items  placement in the  operating budget. He  said that                                                                    
operating  budget  dollars  lapsed   on  June  30,  and  the                                                                    
department  had a  commitment to  provide housing  on for  a                                                                    
three-year period.                                                                                                              
                                                                                                                                
Vice-Chair  Fairclough said  that  the  legislature had  set                                                                    
criteria inside  of the  corporation that  prioritized need,                                                                    
some of which  was based on whether a person  was in danger.                                                                    
She  reiterated that  the  request should  be  put into  the                                                                    
operating budget.                                                                                                               
                                                                                                                                
10:54:38 AM                                                                                                                   
                                                                                                                                
Mr. Campbell spoke to Slide 2:                                                                                                  
                                                                                                                                
     RN 37918                                                                                                                 
     Housing Loan Program: Teacher / Health / Public Safety                                                                   
     $6,000,000                                                                                                               
                                                                                                                              
     Purpose: Provide gap funding to increase homeownership                                                                   
     and/or rental units.                                                                                                       
     Projected outcome:                                                                                                       
          •Improving retention of desirable professionals                                                                       
          through housing development                                                                                           
                                                                                                                                
Mr. Campbell turned to Slide 3:                                                                                                 
                                                                                                                                
     RN 49395                                                                                                                 
     Housing Loan Program: Teacher / Health / Public Safety                                                                   
     $5,000,000                                                                                                               
     Purpose: Provide gap funding to increase homeownership                                                                   
     and/or rental units.                                                                                                       
     Projected outcome:                                                                                                       
          •Increase Teachers, Health Professionals, or                                                                          
          Public Safety official's housing in rural Alaska                                                                      
                                                                                                                                
10:56:07 AM                                                                                                                   
                                                                                                                                
Co-Chair Meyer  asked whether the  program had  succeeded in                                                                    
attracting  and  retaining  teachers. Mr.  Campbell  replied                                                                    
that it had helped to retain teachers.                                                                                          
                                                                                                                                
10:56:36 AM                                                                                                                   
                                                                                                                                
Mr.  Butcher interjected  that AHFC  could get  back to  the                                                                    
committee with more information.                                                                                                
                                                                                                                                
10:57:20 AM                                                                                                                   
                                                                                                                                
Senator Dunleavy noted  that he lived in the  housing for 20                                                                    
years. He thought that the program was commendable.                                                                             
                                                                                                                                
10:58:04 AM                                                                                                                   
                                                                                                                                
Co-Chair Meyer  restated his  question to  Senator Dunleavy.                                                                    
Senator Dunleavy  believed that  the program was  helping to                                                                    
retain teachers.                                                                                                                
                                                                                                                                
10:58:35 AM                                                                                                                   
                                                                                                                                
Mr.  Butcher stated  that at  the inception  of the  program                                                                    
people  did not  want  to participate,  but  wanted to  wait                                                                    
until it  became a  grant program.  He said  that ultimately                                                                    
several school  districts worked  with the corporation  on a                                                                    
model  that proved  successful  in  all participating  rural                                                                    
school districts.                                                                                                               
                                                                                                                                
10:59:17 AM                                                                                                                   
                                                                                                                                
Vice-Chair Fairclough  asked if the corporation  was working                                                                    
with  Cold Climate  Research Center  to make  sure that  the                                                                    
buildings  being built  were energy  efficient. Mr.  Butcher                                                                    
replied  in  the  affirmative.  He added  that  all  of  the                                                                    
building programs  under the  corporation had  a requirement                                                                    
of a high energy efficient standard.                                                                                            
                                                                                                                                
11:00:48 AM                                                                                                                   
                                                                                                                                
Co-Chair  Meyer inquired  whether the  photos in  the slides                                                                    
were current. Les Campbell replied yes.                                                                                         
                                                                                                                                
11:01:20 AM                                                                                                                   
                                                                                                                                
Mr. Campbell addressed Slide 4:                                                                                                 
                                                                                                                                
     RN 49369                                                                                                                 
     Housing Loan Program: VPSO                                                                                               
     $1,000,000                                                                                                               
                                                                                                                                
     Purpose: Provide gap  funding to increase homeownership                                                                  
     and/or rental units.                                                                                                       
     Projected outcome:                                                                                                       
          •Adding units for Village Public Safety Officers                                                                      
          (VPSO);                                                                                                               
          •Increasing   VPSO   retention   through   housing                                                                    
          development                                                                                                           
                                                                                                                                
Mr. Campbell continued to Slide 5:                                                                                              
                                                                                                                                
     RN 6323                                                                                                                  
     Supplemental Housing Development Program                                                                                 
     $7,000,000                                                                                                               
                                                                                                                                
     Purpose: Supplement  federal housing funds  provided to                                                                  
     regional  housing authorities  to ensure  safe, decent,                                                                    
     affordable housing.                                                                                                        
     Projected outcome:                                                                                                       
     •Construction  of affordable  homes in  up to  20 urban                                                                    
     and rural communities;                                                                                                     
     •Build on-site water and sewer facilities;                                                                                 
    •Provide energy-efficient design features in homes;                                                                         
     •Construct roads to project sites;                                                                                         
     •Provide electrical distribution systems;                                                                                  
     •Retrofit homes  to provide  a safe,  healthy, workable                                                                    
     home environment; and                                                                                                      
     •Provide  clients  with  new, safe,  energy  efficient,                                                                    
     comfortable housing.                                                                                                       
                                                                                                                                
Mr. Campbell turned to Slide 6, which provided images of                                                                        
the construction of the housing development.                                                                                    
                                                                                                                                
Mr. Campbell addressed Slide 7:                                                                                                 
                                                                                                                                
     RN 6351                                                                                                                  
     Energy Efficiency Monitoring Research                                                                                    
     $750,000                                                                                                                 
     Purpose:   Conduct   research,  analysis,   information                                                                  
     dissemination,  and interchange  among  members of  the                                                                    
     industry,  as  well as  between  the  industry and  the                                                                    
     public.                                                                                                                    
     Projected outcome:                                                                                                       
     •Conduct research,  analysis, information dissemination                                                                    
     and  interchange among  members  of  the industry,  and                                                                    
     between industry and the public;                                                                                           
     •Gather  data and  perform  analysis of  geographically                                                                    
     diverse area energy-efficient designs for homes; and                                                                       
     •Monitor  homes  for   energy  usage,  comfort  levels,                                                                    
     durability,  occupant health  and economic  benefits of                                                                    
     efficiency features.                                                                                                       
                                                                                                                                
11:04:33 AM                                                                                                                   
                                                                                                                                
Vice-Chair Fairclough inquired whether the research was                                                                         
receiving any additional funding from Alaska Energy                                                                             
Authority (AEA). Mr. Campbell said that he did not know.                                                                        
                                                                                                                                
Mr. Campbell spoke to Slide 8:                                                                                                  
                                                                                                                                
     RN 6334                                                                                                                  
     Senior Citizen's Housing Development Program (SCHDP)                                                                     
     $4,500,000                                                                                                               
                                                                                                                              
     Purpose:  Provide  funds   for  development  of  senior                                                                  
     citizen  housing  and   accessibility  modification  to                                                                    
     seniors' residences.                                                                                                       
     Projected outcome:                                                                                                       
     •Three development projects or about 30 units;                                                                             
     •Modifications for  accessibility for  approximately 50                                                                    
     units; and                                                                                                                 
     •Provide  technical  assistance   grants  for  building                                                                    
     capacity in organizations that develop senior housing.                                                                     
                                                                                                                                
Mr. Campbell spoke to Slide  9, which contained two pictures                                                                    
of  Raven's View  1 and  2: Cooper  Landing Senior  Citizens                                                                    
SCHDP, Denali  Commission, AHFC financed 12  units, 2007 and                                                                    
2008.                                                                                                                           
                                                                                                                                
Mr. Campbell addressed Slide 10:                                                                                                
                                                                                                                                
     RN 6347                                                                                                                  
     HUD Federal HOME Grant Program                                                                                           
     $750,000 State General Funds                                                                                             
     $3,750,000 Federal Receipts                                                                                              
                                                                                                                              
     Purpose:   Expand  supply   of  affordable,   low-  and                                                                  
     moderate-  income  housing  and strengthen  ability  of                                                                    
     state  to design  and implement  strategies to  achieve                                                                    
     adequate   supply   of   safe,   energy-efficient   and                                                                    
     affordable housing.                                                                                                        
     Projected outcome:                                                                                                       
     •Develop   affordable   rental   housing   by   funding                                                                    
     development gap  for three rental projects  or about 30                                                                    
     units;                                                                                                                     
     •Assist  35  homebuyers  to achieve  homeownership  for                                                                    
     lower-income  families by  providing  down payment  and                                                                    
     closing cost assistance; and                                                                                               
     •Preserve   low-income   homes   through   a   moderate                                                                    
     rehabilitation.                                                                                                            
                                                                                                                                
11:07:00 AM                                                                                                                   
                                                                                                                                
Mr. Butcher  interjected that  the corporation  had recently                                                                    
begun work with the Department  of Correction on the program                                                                    
in an  effort to  work toward  rental assistance  for people                                                                    
recently released from prison.                                                                                                  
                                                                                                                                
Mr. Campbell shared that the  program had funded 49 projects                                                                    
containing 886  units and had  rehabilitated 414  low income                                                                    
homes. He  furthered that the  program had assisted  409 low                                                                    
income  households to  purchase  homes and  had provided  87                                                                    
households with rental assistance to prevent homelessness.                                                                      
                                                                                                                                
Mr. Campbell spoke  to Slide 11, which was a  picture of the                                                                    
project Hooper Bay Family Housing.                                                                                              
                                                                                                                                
Mr. Campbell discussed Slide 12:                                                                                                
                                                                                                                                
     RN 6342                                                                                                                  
     HUD Capital Fund Program (CFP)                                                                                           
     $3,200,000                                                                                                               
                                                                                                                              
     Purpose: Renovate  and modernize public  housing rental                                                                  
     units statewide.                                                                                                           
     Projected outcome:                                                                                                       
     •Modernize public housing rental units;                                                                                    
     •Code compliance; and/or                                                                                                   
     •Conduct energy audits.                                                                                                    
                                                                                                                                
Mr. Campbell spoke to Slide 13:                                                                                                 
                                                                                                                                
     RN 6348                                                                                                                  
     Federal and Other Competitive Grants                                                                                     
     $3,000,000 Federal Receipts                                                                                              
     $1,500,000 State General Funds                                                                                           
     Purpose:  Allow AHFC  to apply  for HUD,  other federal                                                                  
     agency,  and  private  foundation  grants  that  target                                                                    
     housing  needs and  supportive  services of  low-income                                                                    
     and groups  with needs such  as senior  citizens, those                                                                    
     with mental,  physical, or  developmental disabilities,                                                                    
     or homeless Alaskans.                                                                                                      
     Projected outcome:                                                                                                       
     •HUD Supportive Housing;                                                                                                   
     •Housing Opportunities for Persons With AIDS (HOPWA);                                                                      
     •Grant Match Program; and                                                                                                  
     •OneCPD  HUD  Technical Assistance  Program  (Community                                                                    
     Planning Development); and                                                                                                 
     •Section   811  Housing   Program   for  Persons   with                                                                    
     Disabilities.                                                                                                              
                                                                                                                                
11:10:50 AM                                                                                                                   
                                                                                                                                
Mr. Campbell addressed Slides 14 through 16:                                                                                    
                                                                                                                                
     RN 6350                                                                                                                  
     Competitive Grants for Public Housing                                                                                    
     $750,000 Federal Receipts                                                                                                
     $350,000 State General Funds                                                                                             
                                                                                                                              
     Purpose:  Allow AHFC  to apply  for HUD,  other federal                                                                  
     agency,  and  private  foundation  grants  that  target                                                                    
     housing  needs of  low-income and  groups with  special                                                                    
     needs who live in public and/or assisted housing.                                                                          
     Projected outcome:                                                                                                       
     •Match requirements for federal grants such as:                                                                            
     •Family  Self-Sufficiency  (FSS) Coordinator  and  case                                                                    
     workers;                                                                                                                   
     •Senior Services Coordinator; or                                                                                           
     •Resident Opportunities and  Supportive Services (ROSS)                                                                    
     grant.                                                                                                                     
     •Match  for  operations  of services,  such  as  after-                                                                    
     school  programs,   public  housing   developments  and                                                                    
     resident computer training labs.                                                                                           
                                                                                                                                
     RN 52598                                                                                                                 
     AHFC Energy Programs                                                                                                     
     $45,000,000 State General Funds                                                                                          
     $1,500,000 Federal Receipts                                                                                              
     Purpose: Provide cost-effective  energy improvements to                                                                  
     homes.                                                                                                                     
     This appropriation has two allocations for:                                                                                
          •AHFC Weatherization Program                                                                                          
          •AHFC Energy Rebate Program                                                                                           
                                                                                                                                
     RN 50683                                                                                                                 
     AHFC Energy Programs - Weatherization                                                                                    
     $27,500,000 State General Funds                                                                                          
     $1,500,000 Federal Receipts                                                                                              
                                                                                                                              
     Purpose: Provide cost-effective energy improvements to                                                                   
     homes occupied by low-income families throughout the                                                                       
     state.                                                                                                                     
     Projected outcome:                                                                                                       
    •Reduce household operating costs of the resident;                                                                          
     •Improve resident health and safety;                                                                                       
    •Improve durability and longevity of housing stock;                                                                         
     •Replace unsafe heating systems;                                                                                           
     •Install smoke detectors and/or carbon monoxide                                                                            
     detectors;                                                                                                                 
     •Create and sustain local jobs                                                                                             
                                                                                                                                
Mr.  Butcher interjected  that approximately  66 percent  of                                                                    
the  houses that  had been  weatherized  contained either  a                                                                    
senior citizen  or person with  a disability, 37  percent of                                                                    
the homes contained children under the age of 6 years old.                                                                      
                                                                                                                                
11:13:07 AM                                                                                                                   
                                                                                                                                
Co-Chair Meyer acknowledged the good work done through the                                                                      
program.                                                                                                                        
                                                                                                                                
Mr. Campbell turned to Slide 17, which contained two                                                                            
images; one "before", and one "after" image of a home that                                                                      
had been weatherized.                                                                                                           
                                                                                                                                
Mr. Campbell discussed Slide 18:                                                                                                
                                                                                                                                
     RN 51947                                                                                                                 
     AHFC Energy Programs - Home Energy Rebate                                                                                
     $17,500,000                                                                                                              
                                                                                                                              
     Purpose:   Assist    homeowners   to    decrease   fuel                                                                  
     consumption   by    providing   rebates    for   making                                                                    
     recommended,  cost-effective   energy  improvements  to                                                                    
     their homes throughout the state.                                                                                          
     Projected outcome:                                                                                                       
    •Reduce household operating costs of the resident;                                                                          
     •Improve resident health and safety;                                                                                       
    •Improve durability and longevity of housing stock;                                                                         
     •Replace unsafe heating systems; and                                                                                       
     •Gather statistical intelligence about home energy                                                                         
     consumption.                                                                                                               
                                                                                                                                
Mr. Campbell shared  that the program rebate could  be up to                                                                    
$10,000, the average was approximately $7,000.                                                                                  
                                                                                                                                
11:14:51 AM                                                                                                                   
                                                                                                                                
Co-Chair  Meyer  inquired  about   the  wait  list  for  the                                                                    
program. Mr.  Campbell replied that  the wait list  had been                                                                    
going  down.  He  said that  there  were  approximately  200                                                                    
people  on   the  waitlist,  but  that   200  requests  were                                                                    
processed weekly.                                                                                                               
                                                                                                                                
11:15:20 AM                                                                                                                   
                                                                                                                                
Mr. Butcher added that the  number of raters for the program                                                                    
had increased, which had helped to lessen the waitlist.                                                                         
                                                                                                                                
11:15:51 AM                                                                                                                   
                                                                                                                                
Senator Hoffman  probed the justification for  the reduction                                                                    
in the general fund of  $5 million, from previous years, and                                                                    
then  increasing again  in 2016  through  2018. Mr.  Butcher                                                                    
replied  that  the corporation  had  worked  to determine  a                                                                    
reasonable number for this particular fiscal year.                                                                              
                                                                                                                                
11:16:59 AM                                                                                                                   
                                                                                                                                
Mr. Cambell spoke to Slide 19:                                                                                                  
                                                                                                                                
     RN 45390                                                                                                                 
     Homeless Assistance Program (HAP) (Mental Health Bill)                                                                   
     $6,300,000 State General Funds                                                                                           
     $850,000 MHTAAR                                                                                                          
     $850,000 GF/Mental Health                                                                                                
                                                                                                                              
     Purpose: Support programs that address homelessness by                                                                   
     providing assistance to families in imminent danger of                                                                     
     becoming homeless or those who are currently homeless.                                                                     
     Projected outcome:                                                                                                       
     •Prevent near homeless individuals and families from                                                                       
     becoming homeless; and/or                                                                                                  
     •Provide homeless individuals and families assistance                                                                      
     to obtain safe, sanitary shelter.                                                                                          
                                                                                                                                
11:18:25 AM                                                                                                                   
                                                                                                                                
Co-Chair  Kelly asked  how many  people were  served by  the                                                                    
program.  Mr.  Campbell replied  that  in  2013 the  program                                                                    
served 8,750 households containing 12,382 people.                                                                               
                                                                                                                                
Co-Chair Kelly  wondered how  a homeless  person financially                                                                    
maintained  residency in  a home  after  the assistance  was                                                                    
given.  Mr. Campbell  replied that  many of  the funds  went                                                                    
toward  support services  and financial  training for  those                                                                    
individuals.                                                                                                                    
                                                                                                                                
Co-Chair Kelly  asked whether  the corporation  was involved                                                                    
with the Housing First program. Mr. Campbell replied yes.                                                                       
                                                                                                                                
11:20:27 AM                                                                                                                   
                                                                                                                                
Mr. Butcher interjected the approach was many tiered.                                                                           
                                                                                                                                
Co-Chair  Kelly understood  that the  corporation's role  in                                                                    
the program was strictly financing.                                                                                             
                                                                                                                                
11:21:11 AM                                                                                                                   
                                                                                                                                
Mr. Campbell  responded that  AHFC partnered  with different                                                                    
organizations throughout the state.                                                                                             
                                                                                                                                
Mr. Campbell spoke to Slide 20:                                                                                                 
                                                                                                                                
     RN 6360                                                                                                                  
     Beneficiary  and Special  Needs Housing  (Mental Health                                                                  
     Bill)                                                                                                                    
     $1,750,000                                                                                                               
                                                                                                                              
     Purpose:  Provide funds  for Alaskan  nonprofit service                                                                  
     providers  and housing  developers to  increase housing                                                                    
     opportunities   to    Alaska   Mental    Health   Trust                                                                    
     beneficiaries  and  other   special  needs  populations                                                                    
     throughout Alaska.                                                                                                         
     Projected outcome:                                                                                                       
     •Add  20  congregate  housing  units  for  people  with                                                                    
     mental illness or developmental disabilities;                                                                              
     •Reduce  recidivism  among  clients  spending  time  in                                                                    
     institutions;                                                                                                              
     •Provide   supportive   housing,   including   assisted                                                                    
     living,   for   people   with  mental,   physical,   or                                                                    
     developmental disabilities, or multiple disorders; and                                                                     
     •Provide transitional housing with support services                                                                        
     for newly recovering alcoholics and addicts.                                                                               
                                                                                                                                
11:23:22 AM                                                                                                                   
                                                                                                                                
Co-Chair Meyer discussed housekeeping.                                                                                          
                                                                                                                                
SB 119 was HEARD and HELD in committee for further                                                                              
consideration.                                                                                                                  
                                                                                                                                
SB 120 was HEARD and HELD in committee for further                                                                              
consideration.                                                                                                                  
                                                                                                                                

Document Name Date/Time Subjects
022014 AHFC Budget Senate FIN - 2-20-20214_ViewVersion.pdf SFIN 2/20/2014 9:00:00 AM
SB 119
022014 DEED FY15 Capital Budget Overview SFIN 2_20_2014.pdf SFIN 2/20/2014 9:00:00 AM
SB 119
022014 DEED MaintenanceFinalListFY15.pdf SFIN 2/20/2014 9:00:00 AM
SB 119